Padel Court Construction guides
Practical, plain-English guides to costs, rules and getting the job done right.
How Much Does a Padel Court Cost to Build in the UK?
A standard outdoor padel court in the UK typically costs £22,000–£35,000 for the court kit supplied and installed, plus £12,000–£25,000 for groundworks and base. LED floodlighting adds £5,000–£12,000. A panoramic court costs £30,000–£48,000 installed. A complete single outdoor court with lighting therefore often lands around £39,000–£72,000, while a canopy starts from £70,000 extra.
Read the guide →Do You Need Planning Permission for a Padel Court?
Most padel courts in the UK need planning permission. The enclosure is usually around 4 metres high, which exceeds permitted development limits for garden structures, and floodlighting is often included. Councils commonly look closely at noise from ball impacts, lighting spill, hours of use, parking and visual impact. Canopies and indoor structures normally also need Building Regulations approval.
Read the guide →Padel Court Dimensions: How Much Space Do You Need?
A padel court has a 20m by 10m playing area enclosed by walls of glass and mesh, typically around 4 metres high at the ends. You need extra space outside the enclosure for construction, access, maintenance and, for panoramic courts, any external supports. Many projects allow a plot of at least around 21m by 11m per court, more for circulation, lighting and spectators.
Read the guide →Panoramic vs Standard Padel Court: Which Should You Build?
A standard padel court has steel posts between the glass panels, while a panoramic court uses special fixings so the glass back walls are post-free for clear viewing. Standard courts cost £22,000–£35,000 supplied and installed; panoramic courts £30,000–£48,000. Panoramic suits show courts, premium venues and spectators. Standard suits most clubs, home courts and multi-court sites on a budget.
Read the guide →How a Padel Court Is Built: Stages and Timeline
Building a padel court runs through feasibility, planning, groundworks and base, then court installation, turf and lighting. Planning decisions on many applications take around eight weeks once valid. Groundworks and the base often take a few weeks, depending on the site and curing time. Installing the frame, glass, turf and lights is usually much quicker once the base is ready.
Read the guide →Get a free padel court construction quote
Tell us what you need and we'll come back with a clear price.
Request a quote